Skip to main content

Looking for suggestions with this project as I will be going beyond  Bump N Go. I prefer to use insulated track but

also have loads of Lionel infrareds which are a challenge with different venues ambient lighting. I would like units

to pause at end stops and perhaps station pause enroute.  Units will be of various lengths so I can live with them

stopping at different points. 

                     Appreciatively, UnclePeteRR

Original Post

Replies sorted oldest to newest

@UnclePeteRR posted:

Looking for suggestions with this project as I will be going beyond  Bump N Go. I prefer to use insulated track but

also have loads of Lionel infrareds which are a challenge with different venues ambient lighting. I would like units

to pause at end stops and perhaps station pause enroute.  Units will be of various lengths so I can live with them

stopping at different points.

                     Appreciatively, UnclePeteRR

Here are some recent threads that may be of interest:

Point to point trolley run (not bumper trolleys)

Station Stop Question

Last edited by Training Wheels

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×