Skip to main content

I want to remove an mth 2 track steel arch bridge with 4 inch spacing center rail to center rail. I only have realtrax 042 turnouts on my layout and I want to replace bridge with a crossover from outer to inner loop. does any know if I need 054 or 072 turnouts to keep the 4 inch center rail spacings.

Original Post

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×