Skip to main content

 

Hello, 

 

I haven't posted in awhile, and I never measured my short-line freight train's average speed over its 124-foot course, so here it is:

 

124 feet x 48=5952 feet in O-Scale, which is 1.13 scale miles.

 

Using my stopwatch, and starting from a realistically slow standing start, I lapped the course in one minute and 42.7 seconds, which is 1.71 minutes. 

 

Using the relationship of 60MPH=a mile a minute, I came up with 1.13/1.71, or 0.66 miles/minute, which equates to .66x60, or 39.65 Scale MPH, which is a reasonable average for a desert-based short-line freight.

 

It's good...I like it!

 

That's  all...

RipTrack

 

 

   

003

002

Attachments

Images (2)
  • 003
  • 002
Last edited by Former Member
Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×