Spent 4 hours Friday morning putting down track. The Lionel fastrack double pretzel loop I got from Legacy Station is up and running.
I ran the MTH. GG1 as a test and it did great.
Next layout will ba a loop that goes on the outside of this track plan & it will have 2 sidings for operating accessories.