Skip to main content

Spent 4 hours Friday  morning putting down track.  The Lionel fastrack  double pretzel loop I got from Legacy Station is up and running.

I ran the MTH. GG1 as a test and it did great.

Next layout will ba a loop that goes on the outside of this track plan & it will have 2 sidings for operating accessories. 

Attachments

Videos (1)
20200403_084912
Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×