I only have room for one or the other. Right now I have a small engine facility that services 2 0-8-0's that my small RR owns. I really would like 1 more industry on my layout and since I plan to run a river right down the center of the layout I was thinking of putting a small water powered grist mill right next too the river. I would have to move my grain elevator too where the engine facility is located. So I can only have 1 or the other on the layout, and have no way of adding more room. I also do not want to cram more track into the layout because I want a good amount of room for scenery.
So what should I add too the layout?