Gentlemen & Ladies,
Today I finally got to the point that I could Break out the Tin and Do an initial 263E P2 run with a complete 263E Work Train Consist, featuring both the 800 and 600 series Crane Cars and the Pittsburgh, Pa Islays Rolling stock. The 263E Work Train ran smooth as Glass on the FasTrack. The Bar Top Train layout is under construction and the floor layout in front of the Fire Place and Bar is in the planning stages. Lots of work going on and we had 5" of snow to deal with here today outside on the drive way, back patio and front walk.
Merry Christmas everybody, hope your's was as fantastic as ours!