Skip to main content

Well I was able to be approved to post the construction pictures of the layout here's a slide show on the Old Town Model Railroad Depot's website of the building and work it took to build the public layout. It only took 3 months to build and like all layouts a layout is never finished, we are still adding lots of new stuff we plan to get sounds added into the layout along with a drive in movie theater.

 

Time period of the layout is set in the 1940's, 1950's.

 

http://oldtownmodelrailroaddep...on/construction.html

Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×