We have been working on our layout for a while now and are slowly making progress.
Our first real progress started with the construction of Bench work in Room1 followed by placement of our Train Sheds for a passenger terminal in the fall of 2010 followed by the Oil Refineryin Spring of 2011 and the Chicago Union Station(CUS) in the Fall of 201.
Over that period of time we installed several other buildings and a decked area over the CUS for a Dinner and a Bus Station to form the core of an intermodal transportation system.
We have been working with benchwork design in room 2 and the supporting buildings for room 2. In the fall of 2012 we built more bench work for our Grain Silo Complex, Power Plant & Coal Minein room 2.
A trip was made to Alan Graziano's to pick up the 3 mainstructures for the 1st part of of the table 2 area. In the mean time 2 ABBA repair shops have been designed and the first one in under construction. An Auto plant has also been designed and is in like for construction for the table 2 area. A transfer table to feed a 12 stall Diesel Fueling and repair shop for 36 Diesel's at a time has been designed and is close to fabrication. A 33" Round Table has been bought and will feed a 10 stall Roundhouse & a 6 Stall Light Roundhouse for small repair. The round houses have also been designed and are in the Que.
In Jan of 2013 Room 3 bench work has started and some placement of our Village has started including the AGQ2 from Train Worxin Dallas,
Some pictures of these areas will follow below.