Skip to main content

Hellow all,

Working on my 10’ X 21’ Mianne layout and tried to figure out how to run track feeds with out screwing in I hooks or screws in the I beams. You all may have seen this before but this is what I’m going to do. I used 3/4” plastic conduit cut to 1/2” one solid and one cut across an 1/8”. I’ll have to make 40 or so but these should work and easy to get to to shoot trouble. 9628CDB9-A489-41CF-B14F-A1C399C86641CC5BF9AA-8B52-47BD-92FD-C7DE8D480EAC

Attachments

Images (2)
  • 9628CDB9-A489-41CF-B14F-A1C399C86641
  • CC5BF9AA-8B52-47BD-92FD-C7DE8D480EAC
Original Post

Replies sorted oldest to newest

IME, Keep your wires up inside the framework.  It is sooooo easy to catch and yank a wire loose when they hang from the bottom of the frame members.  The idea is quick and neat but can be a hassle in the service stage.  Ask me how I know!!

Also as the photo shows, I try to accomplish as much wiring as possible before the deck goes on.  Easier to lean over than crawl under and reach up.   The alpha notations were because the benchwork was built elsewhere and moved to present site. TT

Pre deck wire views 006

Attachments

Images (1)
  • Pre deck wire views 006

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×