Skip to main content

will have to crawl into cabinets and hook up all the power leads, and there are many. but all in parallel so should not be an issue

basic terrain is down, now for the detail work,  when you pick an area about the size of a football, it becomes easier than trying to do more than that, 

i will have some track for sale, ATLAS never had a train run on it mostly long straight runs and 045 sections

 

 

 

 

 

got

Original Post

Replies sorted oldest to newest

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×