Skip to main content

Watching the Rochelle web cam yesterday I caught a crane putting the finishing touches on a new signal bridge over the tracks. The clearance below the signal is much higher then the old one. Is this just an upgrade of replacing the old signals around the diamond or is there a possibility that they are getting ready for higher loads.....Paul

Original Post
paul 2 posted:

Watching the Rochelle web cam yesterday I caught a crane putting the finishing touches on a new signal bridge over the tracks. The clearance below the signal is much higher then the old one. Is this just an upgrade of replacing the old signals around the diamond or is there a possibility that they are getting ready for higher loads.....Paul

Higher loads than a double stack container train?

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×