Skip to main content

Brendan,

does the step up S-cab board lower run time? It has to be using more current to step the voltage up I would think, but it may be negligible.

It may not even matter to most.  I get over 2-1/2 hours on my 2000 Mah, 9.6v packs in my O-scale engines, a 3.7v battery would be a no-go for me.  That's barely enough to turn the LED headlight on.

It's odd that my G-scale 4-6-0 (with a BlueRail board and 12v, 2000Mah battery) can move out with a single tap on my IPad, but my WbB semi-scale 4-6-2 took a bit more "juice" to make it move.  Must be the gearing, or it could be the difference between the 12v battery in the 4-6-0 and the 9.6v battery in the 4-6-2, maybe both!

Bob Delbridge posted:

Brendan,

does the step up S-cab board lower run time? It has to be using more current to step the voltage up I would think, but it may be negligible.

 

I am sure it does.  I have three 300 Mah batteries in mine. Honestly, I have never run it all the way down since I usually run on powered rails.  I have run for at least an hour or so before power to the rails at shows.  

Brendan 

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×