We just got a new double cross over set in place today. Had Brad Strong build this for a junction which ties the mainlines together.
He delivered it with 18 wire drops already in place and gaps cut. Almost fell in place over the Homobed.
Below are shots of it being roughed in place then the Homobed was laid and holes drilled for the drops then slots for the Tortise machines.
We have run about a dozen different large wheel base engines thru this along with a bunch of different passenger cares. Nice job. Just ordered more.
He builds custom curved turnouts in any radius combination. We draw the lines and he matches whatever. Just got 13 with another load coming. Very good guy. Easy to work with. He made the custom diamond to tie the #8s together.
The entire assembly is mounted on one solid interconnected lasered tie base. Nothing flimsey here!