Skip to main content

Replies sorted oldest to newest

I am on a long term quest to add more lighting to my buildings now that SMD LEDs are so readily available. This is my Altoona Model Works tower that’s been on my layout for a few years now retrofitted with some soft LED lighting and 3D printed interior parts. The relay rack and interlocking machine are simplified and stylized quite a bit. You can barely see the rack unless you peek in the side window. The nice thing about this little project is that all the parts I doodled up can be printed for my other towers now.

AFD5BB24-38DD-4C84-9E37-E6D29B7396BC91C4D333-3F65-473E-9714-276D586CEC22FCBE0B0C-4E46-4EEE-A489-E2B4201B5EA3222113B0-9B6A-43D7-AAB3-11DED078D5BD2C100087-5204-4E5B-AA0D-A0DECDCA44EDDCB1FE14-6CEF-46C0-B8CB-89A90D385C80AF8D6956-8269-4FA7-927E-1A02D696EB96

Attachments

Images (7)
  • AFD5BB24-38DD-4C84-9E37-E6D29B7396BC
  • 91C4D333-3F65-473E-9714-276D586CEC22
  • FCBE0B0C-4E46-4EEE-A489-E2B4201B5EA3
  • 222113B0-9B6A-43D7-AAB3-11DED078D5BD
  • 2C100087-5204-4E5B-AA0D-A0DECDCA44ED
  • DCB1FE14-6CEF-46C0-B8CB-89A90D385C80
  • AF8D6956-8269-4FA7-927E-1A02D696EB96
Last edited by Norm Charbonneau

Wow Norm! A very interesting use of lego pieces for that switch machine!

Haha, that bad huh!? I only tried to make the parts good enough to give an impression through the windows. I printed the track board in clear PLA so I could paint around the signal relays:

D6416639-6508-4C9E-BB19-629F93F6F46564B092FB-C67D-49ED-912F-3E4D8359F8FB

Screenshot 2022-01-16 100711Screenshot 2022-01-16 100557

Next one will be the old Quality Craft Jacks Tower at the other end of the layout. Looking around for interior shots. The relay rack will show up better on that one I think.

Attachments

Images (4)
  • D6416639-6508-4C9E-BB19-629F93F6F465
  • 64B092FB-C67D-49ED-912F-3E4D8359F8FB
  • Screenshot 2022-01-16 100711
  • Screenshot 2022-01-16 100557
Last edited by Norm Charbonneau

The Cabin Creek Coal Tipple BTS kit I began two weeks before Thanksgiving is complete. Signs on the doors and the main Cabin Creek sign  is all I will be adding to the structure.

When I declare the Tipple an scenery is completed I will share the final photos.

Saturday night I listened to college basketball on XM, painted add-on scenery pieces, cut out signs to mount on the structures,  and tested the LED lights.  The instruction book says I have used the 1300 pieces to complete.

D8D2A902-7A76-41DE-9EEA-965C964685C0

Attachments

Images (2)
  • D8D2A902-7A76-41DE-9EEA-965C964685C0: Cabin Creek Coal Tipple
  • 02346F88-AE1B-45E2-9F29-D806D7838BE7: Illuminated Tipple
@Seth Thomas posted:

The Cabin Creek Coal Tipple BTS kit I began two weeks before Thanksgiving is complete. Signs on the doors and the main Cabin Creek sign  is all I will be adding to the structure.

When I declare the Tipple an scenery is completed I will share the final photos.

Saturday night I listened to college basketball on XM, painted add-on scenery pieces, cut out signs to mount on the structures,  and tested the LED lights.  The instruction book says I have used the 1300 pieces to complete.

D8D2A902-7A76-41DE-9EEA-965C964685C0

The model looks great. Can't wait to see it in place.

Bob

@RSJB18 getting close Bob, thanks much.

But I volunteered to assemble the B.T.S.  Cabin Creek Tipple for a model train good friend whose close up vision is gone. He lives In Danville WV in the vicinity of the mines.  Only thing I know about Cabin Creek is Jerry West played high school ball there.  I had several pairs of Jerry West All Star Converse basketball shoes…

The Better Than Scratch BTS production is originated in WV as well…

I would love to deliver the finished Tipple very soon.  But not today. Over 6” of the white stuff everywhere here.

Jim’s layout sports a great coal freight train.

Nice work everyone!  I'm a little late for this week, but I thought I'd share my progress on a Plastruct kit that my wife bought me for Christmas.

Although the kit didn't specify it, I thought the catwalk needed safety railings on the ladder side as well.  In these photos, I'm test fitting the extra railing (black plastic) before painting and gluing in place.

IMG_7521IMG_7526

Next, I'll add some decals and the bottom valves.

Attachments

Images (2)
  • IMG_7521
  • IMG_7526

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×