I left York around 10 AM and made good time back to Richmond......arrived just after 2PM and joined Tom (Gilly&N&W) and Bill who were working on our movable bridge module.
Here are some pics of the "Bridge over Geezer Gorge". There is still lots to do but it is really starting to take shape.
Take a look at the deck.....Tom had some laminate flooring left over from doing his attic....it looks great!
Peter