Skip to main content

I left York around 10 AM and made good time back to Richmond......arrived just after 2PM and joined Tom (Gilly&N&W) and Bill who were working on our movable bridge module.

 

Here are some pics of the "Bridge over Geezer Gorge". There is still lots to do but it is really starting to take shape.

 

 

image

image

image

image

image

image

image

 

 

Take a look at the deck.....Tom had some laminate flooring left over from doing his attic....it looks great!

 

Peter

 

Attachments

Images (7)
  • image
  • image
  • image
  • image
  • image
  • image
  • image
Last edited by Putnam Division
Original Post

Replies sorted oldest to newest

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×