Skip to main content

One of our Top Traintastic customers in New Jersey is having a third extension to his layout installed today by none other than Chief Traingineer - Roger Farkash, TW TrainWorx East Coast Director - Mike Reagan, and honorary Traingineer/Road Warrior Installation Assistant, Alex Mallaie and all reports are they've made "connection" and all is going well. So far, four pictures in from installation -Enjoy!

IMG_7079IMG_7080IMG_7081IMG_7082 

Happy Tracks!

TrainDame aka Dorcie Farkash
TW TrainWorx
Dallas, TX | Concrod, NC
(214) 634-2965
www.blog.traindame.com 

Attachments

Images (4)
  • IMG_7079
  • IMG_7080
  • IMG_7081
  • IMG_7082
Original Post

Replies sorted oldest to newest

Alex M posted:

This was an enjoyable Two days to get to work side by side with Roger and Mike. This existing layout and the new extensions are absolutely beautiful!!!! 

 Alex M 

 

Thanks again for all your assistance Alex - always great to hear what a pleasure it is to work with you and how helpful you are - definitely reports from onsite I love to hear!!!! 

jerrymouse25 posted:
Traindame posted:

Here is the first 3' x 7' section with the second not attached:

IMG_7088

And this is the second table disconnected:

IMG_7089

 

Hi, will the three stall engine house be offered in the future? Just what I've been looking for.

Shhhhhh, don't tell any Trainiac friends - I do believe Reagan will be debuting this as a new TW TrainWorx Kit next week in York.... shhhhhhh

I know nothing....

You know, there is always something amazing with making a little look like a whole lot more. It is small looking, but it just seems so huge at the same time. Awesome job, another great success.

Also, seeing the first picture with the display cases in the back, made me think of refrigerator cases. Yeah, I know it is silly, but it looks like it, but very cool though.

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×