I'M GOOD ON MECHANICALS..BUT ALWAYS HAVE TROUBLE WITH ELECTRICAL... I AM WIRING A SIDE-TRACK USING ATLAS O GAUGE 3-RAIL TRACK...I PLAN TO USE A SWITCH TO TURN POWER ON/OFF ON THIS SECTION OF TRACK...COMMON SENSE SAYS I ONLY NEED ONE WIRE RUNNING FROM THE CENTER RAIL AND THROUGH A ON/OFF SWITCH TO TRACK POWER FROM THE TRANSFORMER...RIGHT?.....THANKS TONY
Original Post
Replies sorted oldest to newest