Skip to main content

I have just about completed my walk through hydraulic bridge, made with the Atlas double track Pratt Truss Bridge.  I added a gas shock and fabricated a couple of hinges to swing it up and out of the way for easy passage to the middle control area of my work-in-progress layout.  Still have a few more tweaks to make on the final alignment when bridge is down, and hope to have them complete in the next week.

 

Hopefully the video is viewable.

Attachments

Images (4)
  • photo 1
  • photo 2
  • photo 3
  • photo 4
Files (1)
Last edited by marksouth
Original Post

Replies sorted oldest to newest

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×