The circus has come to town and is ready to unload.
I added the sidewalks and cement cap/end pieces for the underpass, along with some ground cover. I installed more retaining wall pieces and some ground cover behind the girder bridge, and installed a cement retaining wall in front of the higher level industrial area on the layout known as “the hole”. I’ll add the street portion to connect that area with Jericho Turnpike (underpass) soon. I also put in a layer of some 1/2” Homasote in the corner and up the side of the grade. I’ll paint it earth brown and put down some ground cover and trees. I think it’ll be nice to give this area a little elevation. Thanks for looking.
Andy
Attachments
Attachments
Attachments
Attachments
Lucky find from defunct local line
Attachments
briansilvermustang posted:
Oh, Deere!
Attachments
Short Union Pacific manifest
Attachments
Add Reply
Sign In To Reply