Skip to main content

WRGMILW posted:

TO Garrett76

You & your family have a great layout !

did you screw down the track to the plywood? 

is the layout staying in that room all year long ?

Merry Christmas ! 

Thanks.

The Fastrack is screwed down on the backside of the layout in the areas I cannot reach from the front.  The track is floating in the front so that I can lift it up to paint near it and tuck the snow fabric underneath.

The layout will stay in place through early Feb.  I will try to meet my goal of setup by Thanksgiving for 2016

Thanks,

Garrett

Dtrainmaster posted:

You did a good job on this in a short period of time, so I'm hesitant to make this suggestion in case you haven't had the time to do it yet. A dark colored skirt around the perimeter, down to the floor, will do wonders to enhance this layout.

I like the track plan looping behind the tree.

Dave

Thanks.  There are additional features I have in mind and I will continue to add to it through Feb.  Hopefully it will just require setup next November, no more design and build!

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×