I currently have a 3rd Rail DM&IR Yellowstone, which as never been out of the box, and will hopefully someday have a Big Boy. So in playing around on RR Track software, what radii should I use to be on the safe side? I use the rule of thumb that you should double the radius from 3 rail to 2 rail so if a 3 rail Big Boy needs 36" radius (O72), then a 2 rail equivalent should need a 72" radius (O144). Am I safe in this assumption or should the radii be bigger?
Original Post