Skip to main content

My Bassett-Lowke LMS Enterprise tinplate live steamer arrived as I was going out the door to work.  After shift, I came home and got to unpack my new train.  After some wipe down, oiling the locomotive was ready.  But after a test filling of the alcohol burner revealed a split seam at the rear of the tank, a quick resoldering job was in order.  After that was squared away, the fire was lit and a short test run was done on blocks.  She runs well.  With no actual throttle, speed is controled by the load she pulls.  Obviously at this hour, a run on track is not an option as my wife would have my hide for that.  Hope to get a chance to run it on track later this weekend.  

BLsteaming

Attachments

Images (1)
  • BLsteaming
Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×