Skip to main content

After reading a few other posts, I got to wondering how the majority of the folks on the forum hook up their Base2 or Base3 to the layout when also using MTH DCS TIU's. Do you run wire(s) to the layout outside rail? or do you run wires to the needed TIU output posts. Just curious as to what your experiences are with signal interference, strength etc if any. Thanks.

Mike

Last edited by LT1Poncho
Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×