I wrote a little description of my recent progress on the "what did you do on your layout" thread and promised some pictures on this thread.
First some pictures of the status of the new bridge leading into my town of Spencer. I have the road deck on and the street leading to it. Next I have to weather the road, stripe it, and add road signs. Then my Milwaukee Road track crew will have to work on the crossings.
I have been busy plastering. I am on my second 25# bag of Durock 45 Plaster and have used 10 rolls of Woodland Scenics plaster cloths, but I am getting there. I have the third coat on these areas and when they dry will be ready to paint base coats.
The river valley is starting to take shape. It will be another focal point on my layout.
I then switched to the area of my grain elevator complex. I moved all the buildings and silos and cut and installed Masonite retaining walls on the track that runs behind the elevators. Then painted it with an aged concrete color, made a 45 degree wing wall and finished the plaster up to it. I had a missing strip of wood the length of this area just behind the fascia that I filled in and painted earth brown color. I then sprayed all the track with camo brown spray paint. Moved the elevators back and experimented with moving them further to the right so I can another grain hopper on the siding. Liked it so will add track and the install a permanent bumper. Painted the plaster to the right of the elevators.
Still getting a little done every day and it is starting to show.
Art