I am adding a subway to my layout. It will only feature one subway train running point to point over about 100' long with 20" change in elevation in a few spots. I need to compress the ramps as much as possible. There will be vertical easements but the question remains what is a maximum practical grade percentage?
I will also be needing a PS-2 MTH subway train.
Thank you.