Thanks to the help I received here I was able to get my new Legacy base and Cab2 installed on my layout. Again the Layout consists of two seperate loops of track. Track one the outer loop is powered by a Lionel 135W Powerhouse now connected through a Legacy power Master. Track two is powered by a 135w powerhouse through a TPC3000 .Both tracks are connected to the legacy base binding post. Operationally all is working ok I run legacy engines on the outer loop and TMCC as well as MTH eigines (seperately) on the inner loop. I also have two switched installed on the track two loop. The issue I'm having is I cannot build a route so that both switches fire in the same direction either out or straight. However the switches can be switched individually from the cab2 remote. So the switches do work.
I have followed the instructions in the manual for building a route however when finished and I try to use the route it does not work. The switches do no fired when the fire icon is pressed. Now there is one statement in the procedure that says to save the route information and that is "watch the on screen prompts and wait until you see the message ROUTE Created! then press CTC to exit. I NEVER SEE THIS MESSAGE. Once again any help or suggestion would be greatly appreciated.
All track and switches are MTH.