Skip to main content

Quick update. My wife and I opened an oldtime coffee and Candy shop so she insisted the train be moved to the store for the holidays. One Uhaul and some distamtling and we are just waiting for the glass guy to take out part of the store front to get it inside. Looks like a minor expansion will take place. haha

Attachments

Images (1)
  • 20131104_104634
Original Post

Replies sorted oldest to newest

Possibly Larry,  I know the 2x7 extension I had take off to move it might be reinstalled as 6x8.  The store front needed modification so all the timing was perfect to move it in as large a piece as possible.  The side story is the location is not permanent, but that is okay.  It's too big for my store so we are in the vacant space next to us with the trains and will sell Christmas items as we'll.

We took over a store that has been in town for 30 years.  Mis-managed the last few.  We cut the size back and a the old left over space got divided into two new spaces.  There was needed glass work to finish up for the new shops so I timed the move when they had the doors off and the mullions out.  Not really a big deal  Thankfully my bench work was 1X4s and not 2X4 and I used 3/8s ply.  I'll get some pictures up when the space is decorated.  For the Candy Shop, I don't have enough room for a display, but I think I am going to consider hanging one form the ceiling.

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×