Looks like GGD is planning a run of 85' Aluminum Coaches, who is going to order and what road are you considering?
Replies sorted oldest to newest
I have ordered the P70 modernized coach P70FAR.
I think these may be plastic
http://www.goldengatedepot.com/images/p70far.jpg
But I do have four of the GGD PRR P85 aluminum coaches produced for the Broadway Limited set..
I have ordered the P70 modernized coach P70FAR.
I think these may be plastic
http://www.goldengatedepot.com/images/p70far.jpg
But I do have four of the GGD PRR P85 aluminum coaches produced for the Broadway Limited set..
If it was something that Seaboard owned I'd join in, but I can't afford to support all the offerings that don't meet my interests.
I hope you guys get enough interested folks that these are a go.
Hi Bob
Oh I understand. Most of the runs of the passenger cars have been without my CN or GTW cars. I am very happy that they my run one of them this time.
quote:i saw that GGD added the Amtrak
I, and some others asked for these, so I made good on it and ordered 4... so I'm helping the cause getting these done.
This run of cars is a definite with a total of 300 being produced. The builder wants to do 60 of a paint scheme which obviously means 5 paint schemes.
Roads that either meet or are close to the 60 criteria are UP, SP, C&O, NYC, and either GN or NP (can't recall which) at this point.
An obvious question to me would be "if there are 90 UP reservations, why wouldn't you do 90 UP cars and cut back on something else"? That is not for me to determine, but I share that sentiment.
If your road name doesn't get done in this run keep the faith as there will be future runs with the proviso of 60 per road name so don't hesitate to reserve if you want to see your road name in future run(s).
rheil
I am not sure how many CN cars Scott got orders for do you?
I also am surprised that there were not enough Amtrak cars on order to make the run.
I ordered 2 of the P70 FAR cars when they were announced a year or two ago,I think.
Norm
Norm have those cars shipped?
Popsrr,
No. I got an email from JDTrains a couple of weeks ago that acknowledged my order with Bob T. I expect them later this spring.
Norm
Norm Thanks for your reply. I think you are right about the P70 time frame. I went back to see what Scott had said about the P70 and his March 3 communication did say they were going in production at that time. So guessing a lot it might mean APR TRAVELING FROM CHINA AND CA and maybe mid may arrival at the buyers homes.