I have installed and tested Proto-3 upgrades in the 2 powered units of the Proto-Sound Premier Coal Turbine, all is fine to this point. I have selected a Veranda set for down loading, F111-F-Veranda-UP-130207bF4X.mth, this is a Proto-3 set. When downloading to the upgraded unit I can only get a System Error: Engine Memory Size2M, No reply to Read/Write Command. Timeout= 500ms, The operation has timed out.
I have Retried 3 time and get the same results. I am using a current laptop and the TIU is upgraded to 6.1.
Any thoughts to make this work would be appreciated.
Thanks, Bill Crace(Trains41)