Skip to main content

I finally decided after a month that my new track has been down to start ballasting. I've done it on 2 of my previous layout but still fell uncomfortable about it. Here's the start about 5 feet done from a pop out. There used to be 2 tracks going into the modified G Scale tunnel so I will probably put in a smaller portal in the future.

B-1B3

 

Attachments

Images (2)
  • B-1
  • B3
Last edited by Dave Ripp.
Original Post

Replies sorted oldest to newest

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×