Skip to main content

I am starting over in terms of track on my Bradford Pa centered pike, This time I am going with PECO.  I was in the process of constructing a MicroEngineering  layout, but just did not like the thin ties and long turnouts. I have small engines (2-3-0 's and small diesel switchers) and would benefit from using tighter turnouts.

Off we go again !

Original Post

Replies sorted oldest to newest

@C.M McMahon posted:

I am starting over in terms of track on my Bradford Pa centered pike, This time I am going with PECO.  I was in the process of constructing a MicroEngineering  layout, but just did not like the thin ties and long turnouts. I have small engines (2-3-0 's and small diesel switchers) and would benefit from using tighter turnouts.

Off we go again !

Lookin' forward to updates!

Have fun!

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×