Skip to main content

Replies sorted oldest to newest

Took a vacation day and made some actual progress on Fish Pier.  I finished assembling the building and now am working on "blocking" - figuring out placement of other buildings and items to have the proper visual effect.  This is loosely based on the Union Freight railroad running through Boston as well as inspired by John Pryke's work and book.  I have lots of detailing and painting work ahead...



The fishing boats moor along Fish Pier to unload their fish onto scales and into the warehouse.

IMG_5753

A rail spur on the other side allows a reefer to be spotted here for loading.

IMG_5756

Atlantic avenue runs in front of the pier and into some downtown stores.

IMG_5764

View from the downtown store and bar along Atlantic avenue.

IMG_5767

Attachments

Images (5)
  • IMG_5753
  • IMG_5756
  • IMG_5764
  • IMG_5767
  • IMG_5773
Last edited by EmpireBuilderDave

little more progress on the cement plant. been working on roof, office building, and placing the kiln building on layout also figuring out where other support buildings will go.  i decided to make the roof an under construction project so more of the detailed inside was visible. i built some scaffolding to support their project just need to get some roof workers on the job. 0BB114F5-51DF-45C9-B5E2-0342DDA2ABA745DD046A-2870-4F9B-B883-838A0D1DA3FB133FE7E0-124D-4FAF-9616-AA8674263320F1664BE5-B516-4919-BB47-10C095C845DC

Attachments

Images (4)
  • 0BB114F5-51DF-45C9-B5E2-0342DDA2ABA7
  • 45DD046A-2870-4F9B-B883-838A0D1DA3FB
  • 133FE7E0-124D-4FAF-9616-AA8674263320
  • F1664BE5-B516-4919-BB47-10C095C845DC

Alan and Dennis both houses are superb.

Steve, as real as usual.

Peter I second what Alan said about Max Foods.  If you used CA glue how do you disassemble it?

Stubby, the cement plant is going to be bigger than my whole layout.  Are the raw materials brought in by rail or will there be a mine on-site?

@stubbygda posted:

little more progress on the cement plant. been working on roof, office building, and placing the kiln building on layout also figuring out where other support buildings will go.  i decided to make the roof an under construction project so more of the detailed inside was visible. i built some scaffolding to support their project just need to get some roof workers on the job. 0BB114F5-51DF-45C9-B5E2-0342DDA2ABA745DD046A-2870-4F9B-B883-838A0D1DA3FB133FE7E0-124D-4FAF-9616-AA8674263320F1664BE5-B516-4919-BB47-10C095C845DC

Outstanding detail! I mean forreal forreal. The water treatment plant, GEEZ!

Dave

coach joe i’m thinking of having a quarry pit in the far right/back of layout. materials will also be brought in by barge to the dock. there will be a train line to carry out cement both bagged and hoppers

dave the circular farm that looks like a treatment plant is actually the wet slurry that is mixed and feed into the cold end of kiln. it comes out other end as clinker once the moisture is removed by the kiln.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×