Skip to main content

Hoping I can get a few questions answered about these SD40-2s. What will be the minimum curve in 3rail. I’d like to reserve some high hoods, but I want to make sure I can run them with having fixed pilots. I am running 054 and 072. Also is there any kind of time frame on when they will be made? I know reservations have been slow, but we have to be getting close. 

Thanks 

Original Post

Replies sorted oldest to newest

According to the announcements from 3RD Rail, the SD40-2 project has been put on hold.    As of this winter, the aim has been moved to doing the early GPs - GP7 and GP9.     Potentially this could include GP18 and GP20 but that has not been stated yet.         

I talked to Scott at the March Meet in Chicago and he said the GP7/9 project is generating a lot of interest and the reservations were coming in very well.     He said he expects this project to go forward to replaced the SD40 project for the near future.

prrjim posted:

According to the announcements from 3RD Rail, the SD40-2 project has been put on hold.    As of this winter, the aim has been moved to doing the early GPs - GP7 and GP9.     Potentially this could include GP18 and GP20 but that has not been stated yet.         

I talked to Scott at the March Meet in Chicago and he said the GP7/9 project is generating a lot of interest and the reservations were coming in very well.     He said he expects this project to go forward to replaced the SD40 project for the near future.

Hopefully Scott can get enough reservations for the SD40. If I could get a solid answer on minimum curve I’d reserve a few. 

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×