I haven't had any updates on there for the last two months or so because me and the wife were discussing the basement and the placement of my layout. My layout is about 2 years old now and I have learned a lot but have made many mistakes along the way. Well over this past holiday weekend we have decided that I will tear down all the hard work I have done and move the layout from the main part of the basement to a bedroom down there.
Things that will be done different:
1) make it a shelf type around the room layout instead of a large table against the wall. All the track/scenery will be in reach of the aisle ways and there will be no access hatches!
2) Change track type! I will be selling off all my Fastrack and be strictly using Gargraves track and Ross turnouts. I will stick with numbered turnouts instead of curve replacement where possible. They will also all be hand thrown using ground throws. Since I run a short line the new track will allow me to really weather it, and add as little or as much ballast as I need to get the look I want.
3) The trackplan will be based on operations. As much as I like my current trackplan it was really for just running trains in circles with some switching opportunities. Yes I will set up the track so I can have some continuous running because sometimes I just want to let the trains run, and my son enjoys it. I will also have hidden yard under the layout to bring trains on and off the layout.
4) I want to be able to run operating sessions like the HO and N scalers do. Car/Card system or something computerized. I want to be able to run operating sessions alone, or with one or two other people.
5) Make my Great Lakes Car Ferry the center of operations and the layout! Alex Malliae built me a great great lakes car ferry but it was an after thought for my layout. It is something I have always wanted on my layout but didn't think I would be able too until I had more space. Well the opportunity came 2 years ago for him to build it for me but it was added to the layout as an afterthought. This new layout it will be the center for the layout and operations. It will also have a proper size yard to go along with it. The new yard will have a proper switching lead, and be large enough to hold 2x the amount of cars that fit on the ferry plus all the idler cars and service cars for the ferry such as the coal hoppers needed to fuel the ferry.
6) I will add a few more industries for operating opportunities. I would like to add a furniture factory, a small auto parts factory, and maybe a food canning facility. All industries will be run by some kind of car/card system or a computerized system to have realistic operations.
Thats it for now and I will be starting to work on a track plan this week. I will post updates and photos of my progress. My timeline will be about a year for me to tear down the current layout and get the benchwork up for the new one.