Skip to main content

I am building a layout with one large oval with a siding.  I want to run two trains in opposite direction, have a train go into the siding and stop, throw the switches to the opposite track and start the other train around the loop to return to it's first position and stop.  Have this run automatic continuous?  Is there a control I can purchase or build to do this?

Original Post
Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×