The basement is messy but I am close to completing the rough in for improvement of problem corner.
1. Increased height of water tower by lengthening support legs. But I may redo that. 2. Disassembled for painting some parts of a walthers golden valley built up depot that came today. 3. Looked over the Lionel Rico station kit that also came today. Looking forward to painting and assembling. 4. Installed last section of a retaining wall with tunnel. 5. Glued foam pieces to foam base for rock face foundation.
Someday I hope to run a train or two.