I am going to replace the current 18 gauge wires that go from my terminal block to the tracks with 14 gauge wire. Some of the connections are now inaccessible due to a top level shelf that I installed. So it it okay to simply "cut and cap" the old wires or is in absolutely necessary that they be entirely removed from the track? Thank you for your time.
-Bob Baker