Skip to main content

I realize there are many topics (most old) on this bridge but I could not find the answer.  So, I pulled my bridge out and about to find a place for it on the new layout.  Yes, I know very LOW clearnance!  Many of my locos barley fit.  So, Im wondering, how to remove the counterweights (not going to operate it as such, but it is a very pretty piece), so to increase the clearance by 1/4 inch When the bridge is full down the counterweights are still slightly in the way  Thanks

Original Post

Add Reply

Post
This forum is sponsored by Lionel, LLC
×
×
×
×
Link copied to your clipboard.
×
×