Skip to main content

Well again, John, your layout is really impressive! Wow, all of that prefabricated Mianne benchwork, a sprawling, custom fitted top, Ross switches and miles of track, along with a myriad  of electrical wiring, power bricks, remotes, etc.

We’ve been watching this thing develop and learning about its progress for years. I’m glad you finally have acres of layout to run your dozens of trains on. Well done. 👍

But, there still seems to be one thing missing. THE SCENERY John, THE SCENERY! Where is it? 🤔  😂😂😂

Vern, the scenery will take a bit longer I suspect.  I'm thinking about it.

I have to finish some detail wiring as well.  I'm still installing some of the Lionel LCS stuff, trying to figure out where signals will be, installing the sound absorbing butyl rubber on the bottom of the second level, etc.

Hmm. 🤔  It seems like we’ve heard that before. But, very well, carry on. 👍

Last edited by Yellowstone Special

With those beautiful trains and smooth running right of way you have all the scenery you need for now.  O scale trains are the scenery!

With three independent loops and a mainline which can easily handle two or three trains you can get the happy juices flowing at anytime.

13 staging tracks  over 12'  long each can supply a varied running session.

John's 3 speaker Big Boy can put you right at trackside!!  Very impressive.

If it really bothers him that bad, he's welcome to come over and help.

Well, it really doesn’t bother me that much, John. It’s just that for as long as your layout has been “under construction,” I thought that at least some scenery would have been done by now. 🤔

And if you didn’t live on the other side of the Rockies and so far away, I WOULD come over and help. ☺️  But just the same, keep up the good work. 😉 👍

Vern, the scenery will take a bit longer I suspect.  I'm thinking about it.

I have to finish some detail wiring as well.  I'm still installing some of the Lionel LCS stuff, trying to figure out where signals will be, installing the sound absorbing butyl rubber on the bottom of the second level, etc.

Is Harry going to come for the scenery John, or make it up as you go along when you get to that point?

Minimalism to the maximum.  It’s all the rage.  I’m quite sure you enjoy the techie part of building a layout, but you’ll soon have all that nailed down.  Running trains is fun enough, no rush to spread a bunch of ground cover and glue all over everything.  A couple buildings wouldn’t hurt I guess  haha.  Nice work so far.  Have fun.

Last edited by William 1

As I’m sure, the signals and the wiring thereof will take precedence over planting a structure somewhere.  But you can always look forward to stringing together a couple skinny wires to put some light in them   haha.  I always enjoyed the wiring and getting things just right then after the bugs are worked out knowing you can run trains, just run trains.

Darn it, sometimes I really do miss my layout.  Enjoy yours, it’s a beauty.  Keep going!

Cheers,       W1

Last edited by William 1

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×