Hi Michael,
The plan is not ready for viewing. The industries are what I imaged would exist at the end of the line and serving a large resort. They are (1) a cold storage warehouse/locker, (2) food wholesaler, (3) fuel dealer, (4) team track, (5) LCL freight house, (6) lumber yard, (7) furniture factory, (8) spur to a lumber company (ties and poles), (9) passenger depot and (10) small engine terminal with turntable. I have one long wall that will accommodate a five track stub yard and be able to receive/dispatch a 12-car train. The staging yard is similar. A hidden turning loop under the layout turns the trains around from staging. Minimum mainline radius is 36 inches with 3.5 inches spacing on curves and 3.25 inches in the yards.
I'm running various scenarios to see how the switching is done with both facing and trailing point switches. I plan to run it by myself so if it takes a while to do it, that will be fine. At this point, I plan to run three scheduled trains, one being a passenger using the same type of equipment as the San Juan. The time period is about 1940.
Paul