I have my entire 16x10 layout on casters. When I need to access the back side of it, I just pull the whole thing about 1 to 1.5 ft from the wall, crawl underneath, and do what I need to do. Lighter weight construction and a little planning keeps me from having to crawl on top of it.
What do you do?