Skip to main content

Replies sorted oldest to newest

there is nothing on re-stringing the weights and bridge.

you need to follow the cables along the pulleys from the bridge to the counterweights.

since the bridge operates independently between the two towers the distance between the towers themselves needs to be such that the bridge can operate up and down. So fix one tower at the base and then space the 2nd tower between the bridge and then fix it as well.

The inside height of the bridge is not tall enough to fit tall cars such as the scale autoloaders. I modified the bridge height so that the tall cars will fit.



See Bridge Modifications

Last edited by AlanRail

Add Reply

Post
This forum is sponsored by Lionel, LLC
×
×
×
×
Link copied to your clipboard.
×
×