Skip to main content

Dear Folks,

 

I am heading back home after a very productive trip to Asia.

 

I posted shortly before about our new facility in the Philippines. Our PRR L1 is finished and will be coming in shortly. Next on their plate are the Erie S3/S4  Berkshires. 

 

Our FP7s were quickly inspected in the beginning of this trip and will arrive Jan 2nd. Shipping the following week.

 

I stayed at the factory long enough to see samples of our Canadian Train, where I have updated pictures and the brochure for this model production. You can find it on our web site at http://www.3rdrail.com/reservation.html#CAN

 

A short time later a Production sample of the SP AC9 was completed showing me all our corrections over the years have not been ignored. What a fantastic model. Built with our I3D team (Integrated 3D Design and Engineering), this models is by far the most detailed and  accurate ever produced for 3 Rail. Seeing is believing.

 

In addition to the AC9, the factory presented the PRR BM70M RPO, HORSE and THEATER EXPRESS Cars. We have updated our web site to show these fantastic models. Below is a view inside the BM70M showing the mail sorting station.

 

The B&O Columbian and 1938 Broadway Limited cars are in production as well, and all these models will be in a container at the end of January on their way to us.

 

We want to thank all of you who have supported us by buying our models and reserving our models in 2013. We wish you all a HAPPY and HEALTHY New Year.

 

Come see our web site for new and exciting project news and information.

 

Cheers,

 

Scott Mann

 

 

 

 

 

 

 

 

 

 

PRR-BM70M-MAIL1

PRR-HORSE-END1

PRR-THEATER1

spac9-coal1

spac9-fire1

Attachments

Images (5)
  • PRR-BM70M-MAIL1
  • PRR-HORSE-END1
  • PRR-THEATER1
  • spac9-coal1
  • spac9-fire1
Original Post

Replies sorted oldest to newest

Scott, is it possible to shoot a video that would provide a sound sampling of your new OEM Railsounds system? I am interested in a couple of your to be built steam engines 

and would appreciate hearing your new sound system before ordering.

 

Has anyone taken delivery of the new 3rd Rail Steam Engine that features the 

"TMCC/New OEM Railsounds" as noted in the 3rd Rail Newsletter?

 

thanks,

Bill

Image

Attachments

Images (1)
  • Wounded Warriors: Please support our Wounded Warriors this Christmas

We have been waiting for our new sound system from Lionel for our AC9. Basically from what we are told by OGR reviewer is that these new sounds are equivalent to RS 5.0. They have taken out road specific Crew Talk and do not have Legacy whistle control. But the dynamic chuffing is really good, and the volume of the sounds are much better than the RS 4.0 we had before.

 

I will see if we can get some videos.

 

Scott

As you can see from this picture, the cab door area is not in the same plane as the rest of the cab. It is set inward. Thus you see that on our model, designed using the integrated 3D design method. The roof line is not straight either, like it was an after thought.

 

Scott Mann

SPAC9-CANYON1

SPAC9-CANYON1

SPAC9-CANYON2

ac9-cab-wall1

Attachments

Images (3)
  • SPAC9-CANYON1
  • SPAC9-CANYON2
  • ac9-cab-wall1
Last edited by sdmann
Post
×
×
×
×
Link copied to your clipboard.
×
×