We are selling metal railings for upper level tracks. Screw railing on either side of 1/2" plywood to make a very sturdy upper level. Supports are needed only, approximately, every 8 feet. Railing can also be placed around the table edge. Our website is clouse-model-rails.square.site. We can also be found on Ebay and Etsy.
Attachments
Original Post