The 6 packs I ordered arrived, the other 3 packs I didnt use will be spreaded around in my Daylight passenger train. Here is what I had to do to install them.
1. Cut the legs off
2. Glue them and separate them around.
So my SANTA Fe heavy weight passenger car took 25. And my USMRPO car will take 2 on the benches. Here are some pics
Overall the look, feel and smell(why did I say that? ) like K-Line even thought they are made by O-Line Reproductions.