My plans for 2016's Christmas Layout are complete and ready to be built.
As I do every year, I create a few 'must dos' and a few 'really want to dos'. This year's are:
ABSOLUTE TOP PRIORITY – I only had this one MUST
The Christmas tree had to be as close as possible to the front of the layout so that personalized items and Train Party tree gifts were easily visible. Also, the new Lionel balls from Leighanne and Mike (2015 present).
SECONDARY GOALS – this was considered as a wishful must but became a must as I went on
I wanted the Winter scene, the Easter scene, and Halloween scene up front, especially the Halloween one where the figures are on the street trick-or-treating.
FOLLOWUP GOALS
Both tin-plates had to reverse
I had 2 extra switches so the tin-plates could connect
Use ramps for the Lionel train. Fun to run. Can use O27 switches.
Family – fun to run. Can use O27 switches.
The 1st one is the lower layer measuring 12' x 14'. Two tin-plate trains will run on it. That outer dotted line is a down and up ramp coming from one corner of the 'L-shaped' plateau and going to the other corner of it, which will be obvious by looking at the 2nd diagram. The plateau is 8' on the long sides.
- walt