@Lionelski posted:I finished the 2 reversing loops a lot quicker than I thought I would. The only thing not yet done is adding the controllers. Problem here is I have absolutely no space on my main switch control panel to put them. The sub-control panel show in the 2nd pic is for the operating accessories located in the "Absolute Yards"
I've found that, with the help of Lionel's non-derailing feature, if I initially set the switches in a certain direction, the train will run the entire upper level in a different direction every other time - this added interest was my original goal.
BTW, the liquor train shown is over 18, 1/2 feet long.
Ski, how often does someone finish something quicker than they thought they would?? Did you dip into that liquor train?
The last couple of days I worked on two backboards for my TIU, MTH terminal blocks, and whatever I control my switches and anything else with. The shelf is handy for my Z4000 and TMCC controller. By splitting the 24"x24" shelf in two, every connection will be only a little more than a foot away so I can see what I am doing. This is the location where my two lift-up bridges will attach for the walk-in area.
Next, on the opposite end of the lift-up bridge chasm, there is a nice 4-foot area of Mianne benchwork which is just right to hold the 4 shelves I bought from Alan Dechant (aka MrTrain) from nearby Knox, Pennsylvania. I had just enough 1x2 left to make a frame to mount the 2'x4' section of plywood with braces on 16-inch centers that I can attach the aluminum shelves. I first thought of painting the plywood white to show off the trains, then thought it may be nice to paint it the same as the light blue wall on the other side of the 27" aisle. We will see.