Skip to main content

After the white was painted, the signage was remasked with Nichiban tape and the masking around the letters was recut in the laser. The to-be-painted black "field" area was then unmasked. After two days of drying time, the black field was stipple painted. Here's the last step- unmasking after the black has been painted. 

 

fullsizeoutput_3b2 

Here's the last step- unmasking after the black has been painted. 

Attachments

Images (1)
  • fullsizeoutput_3b2

Here's the final shadowbox model. We look forward to displaying at York in a couple of days! J.B. will be progressing the 6" deep building version for release in about two weeks. Both the shadowbox and building version come with individual floors and ceilings. LED lights are provided for each floor. Windows can be translucent (as shown) or clear. So far, the orders for translucent glazing are 4 times more than those for clear. It may take a while, but ultimate production will be limited to 100 shadowboxes and 50 buildings.

 

IMG_4042IMG_4043

Attachments

Images (2)
  • IMG_4042
  • IMG_4043

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×