Looking for help. I have purchased the new Lionel Base 3, however have not installed it yet. I currently have Lionel Base 2 with remote control with powerbricks supplying power to two tracks via two TPC 400s.I use the handheld to turn all power and base 2 on to the layout.
I understand reading material that the Base 3 takes quite a while to boot up so question: Should I plug base into separate power source and start up first before applying track power?
Additionally I am not sure how I can keep the TPC 400s in the mix or if I even need to as I am not sure I can control the TPCs via the handheld with the BASE 3 replacing the base 2?
Any help appreciated. Al ( email in profile)