Attached are a few recent progress photo of the J&W.

 

Photo 1) Additional overhead lighting installed, bring to 11 the total overhead fixtures

Photo 2 & 3) Temporary Local Switch Panels

Photo 4) Typical Terminal Block

Photo 5) Future overhead Main Control Panel with overhead block wire bundles

Photo 6) Former MTH Single Stall Engine House converted into a building backdrop

Photo 7) Reusing the Engine House footing as a sidewalk/platform

Photo 8) Power Center

 

While wiring the yard and turntable tracks I ran out of red 14 ga wire. Ordered another 200 feet. Until it arrives I will  do the final hook-up of the remote switches auxiliary power.

 

Cheers,

 

 

 

Attachments

Images (8)
  • Additional Lighting
  • Temporary Local Panels
  • Temporary Local Panel
  • Typical Terminal Block
  • Future Overhead Control Panel
  • Former MTH Engine House
  • Former MTH Engine House Footing
  • Power Center
Last edited by Joliet & Western Railway
Original Post

Replies sorted oldest to newest

Thanks Everybody for the compliments and encouragement.

 

While waiting for the additional red wire to arrive today, I completed the orange wire constant power to a PowerMax Plus and  powered up the remote switched for the first time.

 

And the red wire has just arrived. Ordered just yesterday afternoon from McMaster-Carr. There must be over a thousand feet of wiring in this train so far, with most of it red track power wire. That is due to the long runs required to bring the power to the future overhead control board. 

 

Thanks. 